How a Shower Remodel Works, Step by Step

From planning and demolition to waterproofing, tile, glass and the final walk-through: what happens in a shower remodel and why order matters.

2 minute read

Key takeaways

  • A good remodel follows an order: plan, demolish, repair, plumb, waterproof, test, finish and seal.
  • Hidden damage found at demolition is normal and should be repaired before rebuilding.
  • Glass is measured after tile is finished, so there is a short lead time at the end.
  • A walk-through at the end is the time to ask about care and cleaning.

Planning and selections

Remodeling starts with planning: layout, size, entry style, tile, fixtures and glass. Ordering long-lead items early keeps the schedule smooth. Decisions about the valve, outlets and niches need to be made before walls are closed.

A clear plan also helps avoid changes in the middle of the work.

Demolition and repairs

The old shower is removed down to the studs and subfloor. This is when hidden problems show up, such as rot, mold, old plumbing or weak framing. They should be corrected before anything new goes in.

Framing is adjusted for benches, niches and any change to the floor height or drain.

Plumbing, waterproofing and testing

The valve and drain are set, the pan is built and a membrane is applied to the floor and walls. Corners, seams, niches and penetrations must be sealed. The pan is flood tested to confirm it holds water before tile.

This stage is the most important for the life of the shower.

Finishes, glass and walk-through

Tile or panels are installed, grout and caulk are applied and fixtures are fitted. Glass is templated from the finished shower and installed when it arrives. A final walk-through covers cleaning, sealing and what to watch.

Ask for instructions about when the shower can be used after grout and sealing.

Quick answers

How long does a shower remodel take?

It depends on size and finishes, and glass adds a short wait. A typical project runs from several days to a couple of weeks.

Why is glass installed last?

It must be measured from the finished shower, so it is ordered after the walls are done.

Will I be without a shower?

Yes, during the work. Planning ahead for another shower in the house helps.